Roads and Lighting

  • Main road with a width of 35 meters and a total of 4 lanes
  • Secondary roads with a width of 27.50 meters and a total of 2 lanes
  • Avenues in the commercial and residential zones with a width of 15 meters and a total of 2 lanes
  • LED lighting for the roads within the industrial estate and HPS at joint sections and intersections

Water treatment system

  • Common water treatment system: Activated Sludge
  • Treatment system of 18,000 m3/day

Field Hospital, Bangpa-in industrial estate

  • Jointly established by The Federation of Thai Industries,The Committee of Disease Control, Private enterprises and Industrial Plants in Ayudhaya province
  • Serving approximately 700-bed.
  • Sponsored by CH. KARNCHANG PLC. (CK), BANGKOK EXPRESSWAY AND METRO PLC (BEM), TTW PCL (TTW) and Bangpa-in Land Development Co.,Ltd. (BLDC)

Flood Wall

  • Compacted soil dam along with a concrete wall (RC Flood Wall)
  • Highest level +6.00 MSL

Electrical system

Electrical system inside the industrial estate from 2 production sources

1. Provincial Electricity Authority (PEA)

  • Power distribution capacity of 2 X 40 megavolt-amperes (MVA)
  • Voltage of 22 kilovolts (kV)

2. Bangpa-in Cogeneration Company Limited

  • Small Power Producer (SPP) of the cogeneration type
  • Uses natural gas as fuel
  • Generation capacity of 117.5 MW, two plants
  • Distributing 180 MW to EGAT
  • Clients in the Bangpa-in Industrial Estate, 40 MW
  • Voltage of 22 kV and 115kV

Water supply

Water supply operated by TTW Public Company Limited (TTW)

  • Surface water source: Chao Phraya River
  • Water production capacity of 48,000 m3/day

Waste Incinerators

  • 4 incinerators
  • Incinerating capacity of 15-23 tons/day